Oil Prices (today)
Urals $115,74 per bbl.
Brent $116,69 per bbl.
Oil Prices (yesterday)
Urals $114,92 per bbl.
Brent $115,47 per bbl.
Ðóññêèé
RussNeft
About the Company
President of the Company
Management of the Company
History
RussNeft today (its standing in the industry)
Development Strategy
Geography of activities
Structure
Operations
Social Responsibility
Investors and Shareholders
Tenders
Press Service
Health, Safety and Environment
Human Resources
To counterparts
Warning from "RussNeft"
Anti-bribery policy of OAO NK “RussNeft”
Contacts
Site Map

Subsidiary enterprises' Web sites:


Every 30th ton of oil produced in Russia
Annual production of 13 ìln. tons of crude oil
Recoverable reserves of more than 600 ìln. tons
24  producing assets
1 transportation company
Active in 11 regions of Russia and the CIS
More than 13, 000 jobs

 



Write to us
 

Central Siberian Group

ZAO Tomskaya Neft

General Director - Nail Garipov 

ZÀÎ «Tomskaya Neft» was formed in 2001 for the development of Yuzhno-Myldzhinskoye subsoil area. Within this area there were explored 2 oilfields (Verkhne-Salatskoye and Yuzhno-Myldzhinskoye) and 1 gas condensate field (Rechnoye). Total initial reserves of three oilfields by categories C1 and C2 make 8.169 million tons of oil and 7,18 bln. cubic meters of gas, and also 1.720 thousand tons of condensate.  Oilfields development is carried out from 2003 on the basis of projects of production testing. In 2010 ZAO «Tomskaya Neft» produced about 64.581 thousand tons. ZAO “Tomskaya neft” is an operator on oil production at oilfields of “Sobolinoye” group of companies.
In the oilfields of ZÀÎ «Tomskaya Neft» there is a modern production infrastructure. Shift camp, field support base, lines of communication, oilfield networks, discharge valve pipe line, crude oil metering station were constructed. All energy-intensive economy of the enterprise is provided by its own electrical power, received from utilization of associated petroleum gas.
Integration of ZÀÎ «Tomskaya Neft» in the structure of “RussNeft” allowed the Company to reduce its infrastructure expenses on other oilfields of the Tomsk Region, to expedite the terms of their commissioning, and also to increase production output at license areas of ZÀÎ «Tomskaya Neft». In 2010 preparation of the project on construction of gathering pipeline 146 km in length was completed, that allows to carry out products from Stolbovoye and Grushevoye oilfields after infrastructure development to Central Production Facility of Verkhne-Salatskoye oilfield and then send it to subsidiaries of  “Transneft” – Trunk Pipeline Department of Western Siberia.
“RussNeft” relates the development of east Siberian oilfields to the most promising projects of the company. In the foreseeable future “RussNeft” plans to form a new production center on the basis of oilfields of this group, which will substantially supplement the main traditional for the company production centers in Western Siberia and Udmurtiya. 

Contacts:

634034, Russia, Tomskaya Oblast,
g. Tomsk, ul. Mokrushina, d. 9,
stroenie 16
Tel.: 8 (3822) 42-79-78
Fax: 8 (3822) 42-79-63

Copyright © "RussNeft", 2005.
Official notice
Design: Aplex, 2005