Oil Prices (today)
Urals $74,97 per bbl.
Brent $75,67 per bbl.
Oil Prices (yesterday)
Urals $74,87 per bbl.
Brent $75,57 per bbl.
Русский
RussNeft
About the Company
Operations
Social Responsibility
Investors and Shareholders
Press Service
Press releases
Mass media about us
Subscription for news
The newspaper of the Company
Photo Gallery
Health, Safety and Environment
Human Resources
To counterparts
Contacts
Site Map

Subsidiary enterprises' Web sites:


Every 30th ton of oil produced in Russia
Annual production of 12,7 мln. tons of crude oil
Recoverable reserves of more than 600 мln. tons
21  producing assets
  2 refineries
1 transportation company
96 Petrol Stations
Active in 14 regions of Russia and the CIS
More than 20, 000 jobs

 



Write to us
 

March 2010

04.03.2010
"Saratovneftegas" implementing new equipment for difficult wells
Saratov. At well No 18 of Vostochno-Suslovskoye oilfield of OAO "Saratovneftegas" an electric centrifugal pump unit of size 3 was put into operation. The pump unit was designed by OAO "Novomet", one of the leading companies at the oil services market. The new equipment helped specialists of "Saratovneftegas" to find a sucessful solution of the problem of operation a narrow columned well.

An electric centrifugal pump unit is designed for work in the wells with minimal inside column diameter 100 mm, the size of the pump together with the cable is 95 mm. The cascade of the pump is made with the use of powder technology and it results in high geometric precision and upgraded characteristics of work with gas-liquid mixture.  In case of necessity in the wells with high gas factor the units may be equipped with multi-phase pumps.

This kind of equipment was applied in the oil branch of Saratov Region for the first time. The specialists of "Saratovneftegas" are planning further implementation of the units due to which they can achieve good results in work with difficult wells.



Source: "Chetvertaya Vlast"

Copyright © "RussNeft", 2005.
Official notice
Design: Aplex, 2005